Statistics:
- Length:
- 7 km
- Termini:
- Northern: Gateway Mwy (M1), Banyo
- Southern: Gateway Mwy (M1), Eagle Farm
- Suburbs, Towns & Localities Along Route:
- Eagle Farm, Hendra, Nundah, Northgate and Banyo
Route Numbering:
- Current: None
- Former: M1 1 1 20
- Road Authority Internal Classification: 1
- 913
General Information:
Southern Cross Way started life in the 1980s as part of the Gateway Arterial Road (SR20). as the road was developed, the SR20 route number was replaced with NR1, then Metroad 1 and then M1 with the introduction of alphanumeric route numbering.
Originally a number of locations where the route crossed other roads, the junction were controlled by roundabouts before eventually being replaced by grade-separated interchanges and the route slowly being transformed from Super-2 undivided arterial road to motorway standard.
The route passes by commercial, residential and industrial areas and still serves as an important road in the Brisbane road network. Before being named Southern Cross Way, the route was named Old Gateway Mwy.
History:
- June 1980: The Gateway Bridge Company was established to oversee construction of the Gateway Bridge and, following construction, to maintain the bridge and collect tolls. 3
- August 1980 Work began on the six-lane Gateway Bridge over Brisbane River. 2
- December 1985: The Gateway Bridge and motorway approaches were completed.
- 1986: The Gateway Arterial was constructed in two stages and was completed.
- 11 January 1986: The original Gateway Bridge was officially opened. 4 Around 200,000 people attended the opening festivities and walked the new bridge.
- 26 July 1989: Airport Drive to Cannery Drain duplication opened by Minister for Main Roads Bill Gunn. 5
- July 1990: Airport Drive overpass opened. 5
- 19 September 1991: Cannery Drain to Bicentennial Road duplication opened by Minister for Transport David Hamill. 5
- 03 December 1992: Bicentennial Road to Deagon Deviation duplication opened by Federal Minister for Transport Bob Brown. 5
- 12 February 1993: Bicentennial Road overpass opened by Minister for Transport David Hamill. 5
- 9 March 2007: Work starts on second Gateway Bridge over Brisbane River. 6
- July 2009: Upgraded Gateway Motorway north of Gateway Bridge opened to traffic. 7
- 2010: A 7 km stretch of the Gateway Motorway that runs between Eagle Farm and Nudgee Road at Banyo, renamed Southern Cross Way after realignment of Gateway Motorway. 8
- June 2010: Demolition of the old Gateway Motorway Overpass (now Southern Cross Way) over Airport Drive in preparation of new overpass. 9
Click or tap the map to enable panning and zooming
Advance Directional Sign:
AD sign at Eagle Farm approaching Kingsford Smith Dr (SR25), July 2011.
Image © Rob Tilley
Kingsford Smith Drive:
Southern Cross Way at the Kingsford Smith Dr (SR25) interchange at Eagle Farm, July 2011.
Image © Rob Tilley
Reassurance Directional Sign:
Distance sign at Eagle Farm, July 2011.
Image © Rob Tilley
Advance Directional Sign:
AD sign at Hendra approaching East-West Arterial Rd (SR20), July 2011.
Image © Rob Tilley
Advance Directional Sign:
AD sign at Hendra approaching East-West Arterial Rd (SR20), July 2011.
Image © Rob Tilley
East-West Arterial Road:
Southern Cross Way at the East-West Arterial Rd (SR20) interchange at Hendra, July 2011.
Image © Rob Tilley
Advance Directional Sign:
AD sign on the off-ramp to East-West Arterial Rd at Hendra, July 2011.
Image © Rob Tilley
Advance Directional Sign:
AD sign at Nundah approaching Toombul Rd, July 2011.
Image © Rob Tilley
Reassurance Directional Sign:
Distance sign at Northgate, July 2011.
Image © Rob Tilley
Ramp Metering Signals:
Ramp metering signals where Southern Cross Way meets Gateway Mwy (M1) at Banyo, July 2011.
Image © Rob Tilley
Advance Directional Sign:
AD sign at Banyo approaching Toombul Rd interchange, June 2019.
Image © Dean Sherry
Toombul Road Interchange:
Southern Cross Way at the Toombul Rd interchange, Northgate, June 2019.
Image © Dean Sherry
Advance Directional Sign:
AD sign approaching the East West Arterial Rd (M7) interchange, Northgate, June 2019.
Image © Dean Sherry
Advance Directional Sign:
AD sign approaching the East West Arterial Rd (M7) interchange, Northgate, June 2019.
Image © Dean Sherry
East West Arterial Road Interchange:
Southern Cross Way at the East West Arterial Rd (M7) interchange, Northgate, June 2019.
Image © Dean Sherry
Advance Directional Sign:
AD sign approaching the Kingsford Smith Dr (SR25) interchange, Eagle Farm, June 2019.
Image © Dean Sherry
Advance Directional Sign:
AD sign approaching the Kingsford Smith Dr (SR25) interchange, Eagle Farm, June 2019.
Image © Dean Sherry
Kingsford Smith Drive Interchange:
Southern Cross Way at the Kingsford Smith Dr (SR25) interchange, Eagle Farm, June 2019.
Image © Dean Sherry
1 QLD Government, Department of Transport and Main Roads, The State Road Network of Queensland, August 2016.
2 QLD Government, Queensland Roads Edition No 1 March 2006.
3 QLD Government, Queensland Roads, Edition No 8, March 2010.
4 QLD Government, Queensland Roads, Edition No 4, September 2007.
5 Tyler Bullock.
6 QLD Government, Queensland Cabinet and Ministerial Directory, Media Statements, Gateway Upgrade Project well underway, 26 September 2007.
7 QLD Government, Queensland Cabinet and Ministerial Directory, Media Statements, Gateway Upgrade delivers seven kilometres of new motorway, 17 July 2009.
8 Sydney Morning Herald, Gateway renamed the Southern Cross Way, 17 September 2010.
9 QLD Government, Queensland Cabinet and Ministerial Directory, Media Statements, Demolition begins on old Gateway Motorway Overpass, 2 June 2010.